149
X
Nemetschek Structural User Contest 2013 - Category 2: Civil Structures
Category 2: Civil Structures
2
Short description │
New Troja Bridge over Vltava River
The structure of the new Troja Bridge crosses the Vltava River in the northern part of the city centre.
The bridge has two spans - the main span that crosses the river is 200.4 m in length and the side span
is 40.4 m in length. The main span is crossed by a steel network arch, which is extremely flat (the rise/
span ratio is 1/10), and by a suspended tied concrete deck. The side span is a single span completely
in situ cast prestressed concrete structure.
The conclusive structural behaviour and construction process of the bridge is very complex and
difficult. It was necessary to deploy many computational models for simulation and the prediction of
structural behaviour. The results from mathematical simulations were continuously compared with the
results of measurements and computational models were continuously updated.
Novak & Partner, Ltd.
Contact
Lukáš Vráblík
Address
Perucka 2481/5
12000 Prague 2, Czech Republic
Phone
+420 221592053
Email
Website
Novák & Partner Ltd. was founded in July 1992 and initially dealt with bridge design only. Later on, the
company expanded its engineering activities with general and special structural analysis, the design
of road structures and environmental studies. The company provides full design and engineering
services from conceptual preparation up to the provision of implementing documentation, the author’s
supervision, engineering activities, negotiation with public authorities, and expert consulting and bridge
inspection services. We provide services to customers from the Czech Republic, Slovakia, Germany,
Denmark, the Netherlands, Austria, the USA and Russia. Since 2003, the company has operated as
part of the VALBEK Design group. At present, more than 30 employees work for the company as well
as a number of permanent external specialists and students from CTU in Prague, including those
specialised in foundation engineering, general engineering activities and budgeting. The company has
won many awards, e.g. “The Dancing House of Prague”, “Tramway Bridge Hlubocepy - Barrandov,
Prague”, “Bridge over Berounka valley, Prague”.
Project information
Owner
Capital City Prague
Architect
Roman Koucky, Libor Kabrt
General Contractor
Metrostav a.s.
Engineering Office
Mott MacDonald a.s.; Excon a.s.; Novak&Partner Ltd.
Location
Prague, Czech Republic
Construction Period
09/2010 to 12/2013