SCIA User Contest 2017 Online Book

11 Category 1: Buildings 1 Port House - Antwerp, Belgium Mouton cvba Contact Anne Botte Address Voskenslaan, 171 9000 Gent, Belgium Website www.mouton.eu Mouton is active in designing structures, with a strong emphasis on architectural projects. Its philosophy is that structure, like architecture, has to be designed. Moreover, it is often the case that the structure is inseparable from the architecture and structure plays a prominent role in the perception of the design. Mouton’s ambition is to develop a strong structural concept and to help shaping the architectural design. This happens preferably in a team with the architect and other construction partners, and from an early design phase. Owner Antwerp Port Authority Architect Zaha Hadid Architects in collaboration with Bureau Bouwtechniek and Origin architecture and engineer- ing General Contractor Interbuild Engineering Office Studieburo Mouton Construction Period 09/2012 - 09/2016 The new Port House consists of two buildings: a restored former fire station and new construction that has a truly remarkable sculptural form. This elongated volume is approximately 100 m long, 24 m wide and four stories high. It consists of three three-story-high steel trusses: a middle one and two angled facade trusses. The supporting structure of this volume consists of two parts: a sculptural construction in concrete in the form of a trapezium- shaped ring that encloses the south wing of the existing building in a vertical direction, and a four-legged steel structure bent rather like an opened paper clip. The most prominent part of the concrete ring is the inclined concrete front-leg located in front of the building. The bridge links the front-leg with the concrete core in the atrium splits around the masonry tower of the existing building. SCIA Engineer was used to calculate a global model of the new building (steel structure and sculptural concrete forms), including steel checks and reinforcement calculation. For the steel columns in the atrium (with an arbitrary quadrilateral cross section), a nonlinear calculation was performed considering bow imperfections. The eigenfrequencies of the new building were computed and seismic analysis of the structure was performed.

RkJQdWJsaXNoZXIy MTgyMDE=