SCIA User Contest 2005

174 Company Project Power Plant Castelnou Ingenieursbureau STENDESS N.V. Grote Baan 18 9920 Lovendegem Belgium Tel.: +32 9 370 71 25 Fax: +32 9 372 43 95 Contact: ir. Geert Goethals; ir. Jurn De Vleeschauwer Email: [email protected] Website: www.stendess.com A steel and concrete engineering company Stendess can vouch for the total stability analysis of projects. Our approach covers the initial study trough to the end project. With its in-house know-how in steel as well as concrete, the firm is able to offer full study pack-ages for both materials. Thanks to its accumulated know-how and its advanced infrastructure, Stendess can follow up on cross-border projects in accordance with most standards and codes: Eurocode, NBN, NEN, DIN, NF, AISC, British Stan-dards and specific national codes. Key activities • Industrial buildings: steel factories, power plants, depots, etc • Other buildings: service buildings, concert halls, sport facilities, swimming pools, apartment buildings • Bridge construction: all types of bridges • Off-shore projects: lock gates, Roro, oil rigs, … • Industrial equipment: silos, cranes, crane ways • Erection engineering: longitudinal and transverse repositioning, skidding, hoisting,… Type: Gas fired combined cycle power plant (800 MW) Location: Castelnou, Spain Owner: Castelnou energia S.L. Engineering office: Ingenieursbureau STENDESS N.V., Lovendegem, Belgium Contractor: CMI-group, Seraing, Belgium Total steel weight: ± 600 tonnes Dimensions: 18,5 m x 36,5 m x 65 m Building period: middle 2004 - middle 2005 Short description of the project It concerns the realization of 4 identical gas fired combined cycle power plants in Castelnou, Spain. The steel structure had to be designed to support a total equipment weight of ± 2000 tonnes and a total piping weight of 1250 tonnes. About 80% of this weight is situated at a height of ± 30 m. The whole project was situated in a seismic dangerous zone and a high wind speed zone. Use of ESA-Prima Win Description of technical questions solved by ESA-Prima Win The challenge in this project was to design a low budget supporting steel structure for a gas fired combined cycle power plant which was situated in a seismic dangerous and high wind speed zone and of which the to be supported weight (± 2250 tonnes) was situated at a high level above the ground (± 30 m), which is very defavorable in a seismic zone. The simulation of the seismic actions was done by static equivalent horizontal loads in accordance to the natural frequency of the structure. Finding the balance between a relatively low stiffness of the whole structure (in order to decrease the seismic impact) and a sufficient supporting structure with expectable deformations was a high creative demand in the static layout and the dimensioning of the structure. Description of our experience with ESAPrima Win when realizing the project For this project ESA-Prima Win proved its power to calculate at high speed large structures with a great number of bars and a great number of combinations. More, ESA-Prima Win proved that even for large structures the dynamic calculations could be done in an acceptable way and time. Even optimisation of such large structure didn’t give much problems. Used modules • Base • 3D-frame • Dynamics frame • Steel code check (EC3) Power Plant Castelnou SCIA User Contest 2005 / Steel constructions 4 Categorie

RkJQdWJsaXNoZXIy MTgyMDE=