165 4 Nemetschek Engineering User Contest 2009 • Category 4: CAE Industrial Buildings & Plants certain assignment to the layers; this helps to choose or combine the elements according to their properties or user needs. For the elevations of the building, an exact grid mesh according to the architectural drawings had to be created too. Calculation steps • Design and optimisation of steel structure with verification according to the IInd order theory. • Design of the new foundation and verification of the existing foundation. • Design of the connection points between old and new column parts. • For the third calculation further detail modelling with plates was needed. Presentation Four document parts (Scia files) had to be defined for the output to surpass the Scia Engineer document capacity. About 40 drawings with views, elevations and details were derived from the 3D-Model. Extension of storage area for the Steel Trade Company Sachs&Weber