Nemetschek Engineering User Contest 2009

212 Used software: Scia Engineer SPIE-Controlec Engineering Contact Hans van der Kloes Address de Brauwweg 74-82 3125 AE Schiedam NL, Netherlands Phone +31 10 40 90 400 Email [email protected] Website www.spie-nl.com SPIE-Controlec Engineering B.V. is a NEN-ISO-9001 certified multi disciplined engineering company specialised in Feasibility studies, Basic & Detailed Engineering, Procurement, Construction & Project Management projects in the process industry for petrochemical, power, pharmaceutical, food nutrition and governmental services. SPIE-Controlec Engineering is a division of SPIE Nederland B.V. SPIE Nederland B.V. is part of SPIE SA and worldwide active in more than 28 countries, revenue of € 3.5 billion (2008) and more than 27.000 employees. SPIE SA has its Head Quarters in Cercy, France. SPIE Nederland exists of the following divisions • SPIE-Industrie • SPIE-Asset Management • SPIE-Building Systems • SPIE-Controlec Engineering • SPIE-Infra SPIE-Controlec Engineering is based in Schiedam (Rotterdam), Elsloo and Terneuzen, both operating in the local region with a vast variety of clients in the region i.e. AKZO, AVR, Shell, Esso, Exxon-Mobil, Vopak, Total, Eneco, DSM, Tronox, DOW Chemical, Purac, Kuwait Petroleum etc. SPIE-Controlec Engineering employs approximately 350 employees. The engineering disciplines consist of: • Process • Electrical • Instrumentation • Mechanical • Piping • Civil and Structural • Procurement CAE Special Projects 5 Short Description Introduction On the premises of Eurotank Terminal Amsterdam a number of distribution manifolds are required to load and unload oil from storage tanks to cargo vessels and vice versa. A manifold exists of number of pumps, valves, piping, measuring devices etc. to distribute the oils as required. The manifold for the Euro Tank Terminal Amsterdam project has been established with the following SPIEControlec Engineering and design disciplines: • Piping • Mechanical • Electrical • Instrumentation • Process • Civil and Structural Structure The structure consists of: • A piled concrete pit with two slabs on different elevations. Dimensions in lay-out: 13.0 x 40 m2. • A steel structure to support piping, valves, electrical and instrument devices, as well as access platforms. Multi disciplined organisation Generating documents for the design and engineering is a complex electronic exchange of data where precision (specifically location and orientation of all designed components) plays important role, and therefore all disciplines involved give their input in the 3D Autoplant XM model. The purpose of multi disciplined and integrated 3D modelling is as follows: • Avoid clashes during design and engineering and construction. • Generate 2D documents/drawings out of the 3D Autoplant XM model for all disciplines. • Excellence of quality through multi disciplined cooperation. Applications The following applications are involved: • 3D Autoplant XM - used for 3D modelling by all departments. • Scia Engineer - used by Civil and Structural department to perform structural analysis. • Caesar II by Mechanical department to perform mechanical analysis. Tank pit for Euro Tank Terminal Amsterdam The project concerns a tank pit on the premises of Eurotank Terminal Amsterdam. A number of distribution manifolds are required to load and unload oil from storage tanks to cargo vessels and vice versa. A manifold consists of a number of pumps, valves, piping, measuring devices etc. to distribute the oils as required. The manifold for the Euro Tank Terminal Amsterdam project has been established with the following SPIEControlec Engineering and design disciplines: Piping – Mechanical – Electrical – Instrumentation – Process - Civil & Structural. All disciplines started with their design in the 3D Autoplant Model, then all relevant piping data were imported into the Caesar II application, the output of these calculations were exported to Scia Engineer and afterwards was the entire structural configuration was imported in 3D Autoplant XM. Owner: SPIE-Controlec Engineering Architect: n/a General Contractor: n/a Engineering Office: Schiedam Construction Start: 01/11/2008 Construction End: 12/08/2009 Location: Amsterdam, Netherlands Project Information

RkJQdWJsaXNoZXIy MTgyMDE=