151 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 3: Design of Industrial Buildings and Plants 3 Winner - Design of Industrial Buildings and Plants Owner ČEZ, a.s. Architect ÚJV Řež a.s., divize Energoprojekt Praha General Contractor CEEI s.r.o. Engineering Office STATIKA s.r.o. Construction Period From April 2009 to September 2010 Location Temelín, Czech Republic The presented project is a warehouse for the storage of spent nuclear fuel (SSNF) in the nuclear power plant of Temelín. A lot of Government Building Resolutions had to be taken into account. The building is a solution at the end of the fuel cycle, before placing the fuel to a deep repository. The warehouse is divided into two parts - the receiving and the stock unit. The concept of the structure is specially designed according to the international standards for nuclear power installations, which take precedence over the national standards ČSN EN. The standards are very complex and comprise many rules and regulations. Warehouse for Spent Nuclear Fuel Temelín, Czech Republic Quote of the Jury “The project was chosen because of the complexity of special load cases, such as seismic loads, aircraft impact and explosion loads. Also the nonlinear behaviour, the calculation of gradual execution and the interaction with the subsoil added to the high technical level of the project.”
RkJQdWJsaXNoZXIy MTgyMDE=