Nemetschek Engineering User Contest 2011

161 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 3: Design of Industrial Buildings and Plants Category 3: Design of Industrial Buildings and Plants 3 Owner CCB - Italcementi Group Architect ADEM General Contractor Jan De Nul nv - Franki sa Engineering Office ADEM Construction Period From March 2010 to January 2011 Location Gaurain, Belgium Transit Store House of Limestone Quarry Gaurain, Belgium This project is about the construction of a new covered storage space for CCB-Italcementi near Tournai. It concerns 2 extracting drifts, multiple conveyors foundation works, crusher towers, filters, etc. As a consequence of the very tight schedule, a call for tender was issued from preliminary design. Corrected execution documents were issued during the works. A challenging experience that has been economically profitable thanks to the 3D modelling of the project, the calculation with Scia Engineer as well as the drawings with Allplan. Figures of the project: 12.000 m3 concrete, 847 t rebar, 2.5 km piles/rock anchoring, 43.000 m3 earthworks.

RkJQdWJsaXNoZXIy MTgyMDE=