Nemetschek Engineering User Contest 2011

177 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 3: Design of Industrial Buildings and Plants Category 3: Design of Industrial Buildings and Plants 3 Owner SembCorb General Contractor Aker Kvaerner Engineering Office Istroenergo Group, Inc. Construction Period From 2008 to 2009 Location Wilton, Teesside, United Kingdom The project is about a heat recovery steam generator and a feed water tank structure. IEG is the engineering company for the platforms, staircases, stack and feed water system including a feed water tank with a de-aerator, feed water pumps, pipes, and supporting steel structures. The boiler design is based on state of the art technology, to deliver high pressure steam (98 bar) in a big refinery plant. A boiler with supplementary firing is installed downstream of an industrial heavy duty Gas Turbine Frame 6B. The nominal output of the boiler is steam with the parameters: 98 bar, 385° C, 180 t/hr. Heat Recovery Steam Generator Wilton, United Kingdom

RkJQdWJsaXNoZXIy MTgyMDE=