Nemetschek Engineering User Contest 2011

195 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 4: Industrialized Planning Category 4: Industrialized Planning 4 In 2008 we started to design our new office building. For the engineering of the prefabricated concrete frame Allplan Engineering was applied. Using the 3D program we created an optimal fit of the elements and the prefabricated concrete frame could be created in a short span of time. One of the prefabricated concrete walls in the entrance area shows the companies name and logo. The form used for making this special eye catching wall is produced by a company which used the 3D digital information from Allplan Engineering. Owner Radix Exploitatiemaatschappij BV Architect Archicomfort ontwerp en bouwbegeleiding General Contractor Bouwbedrijf Gebr. Meijer bv Engineering Office Ing bureau Alferink-van Schieveen bv Construction Period From November 2009 to June 2010 Location Raalte, The Netherlands Office van den Berg Beton bv Raalte, The Netherlands

RkJQdWJsaXNoZXIy MTgyMDE=