Nemetschek Engineering User Contest 2011

237 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 5: Special Projects Category 5: Special Projects 5 Owner ProRail Architect UNStudio General Contractor BAM/DURA and Buiting Staalbouw Engineering Office Movares Nederland B.V. Construction Period From July 2010 to September 2011 Location Arnhem, The Netherlands The station area in the city of Arnhem will be transformed dramatically during the next few years. As passenger numbers will continue to grow, the railway infrastructure is being substantially revitalized. On the train station a new 4th platform will be added and all current platform roofs and the footbridge will be replaced. UNStudio made a futuristic design for new platform roofs and a fully integrated footbridge. In cooperation with UNStudio, Movares elaborated the design into an economic and solid steel structure. Platform Roofs and Footbridge in Central Station Arnhem, The Netherlands

RkJQdWJsaXNoZXIy MTgyMDE=