Nemetschek Engineering User Contest 2011

79 Project information Short project description Nemetschek Engineering User Contest 2011 - Category 1: Buildings Category 1: Buildings 1 Owner Allgemeines Krankenhaus Wien Architect Moser Architekten General Contractor HABAU Engineering Office TOMS ZT GmbH Construction Period From December 2009 to September 2011 Location Vienna, Austria The project is about the final building stage of the Vienna General Hospital, namely the construction of the new Chirurgical Centre for Children. The building is a nine-storeyed concrete tower with 2 floors below the main level and a surface of about 15.000 m2. The slabs are supported by columns without beams. The façade components have been realized of precast concrete elements. Part of the project was a construction of a steel enclosure on the upper floor and two connection bridges made of steel. The main challenges were the difficult ground conditions and an extremely short construction period. Chirurgical Centre for Children Vienna, Austria

RkJQdWJsaXNoZXIy MTgyMDE=