Nemetschek Structural User Contest 2013

165 X Nemetschek Structural User Contest 2013 - Category 2: Civil Structures Category 2: Civil Structures 2 Short description │Ceintuurbaan Station, North/South Metro Line With its length of 230 m, depth of 30 m and average width of 11 m, Ceintuurbaan is the narrowest station of the North/South line. Its great depth made it necessary to support the combination of diaphragm and retention walls in both the construction and final phases. Therefore, permanent steel struts are installed and prestressed. These struts are designed to bear the horizontal loads and minimise the deflection of the walls during the operational phase. The 3D model made it possible to analyse the behavior of the structure in the construction stages and to anticipate critical situations. Witteveen+Bos Contact Nick Waterman Address Hoogoorddreef 56F 1101 BE Amsterdam, The Netherlands Phone +31 203125555 Email [email protected] Website www.witteveenbos.nl Witteveen+Bos was founded in 1946 by the engineers G.S. Bos and W.G. Witteveen. At the present time, the company comprises eight offices in the Netherlands and eight international offices and has more than 900 employees. Today, Witteveen+Bos is among the top 10 engineering firms in the Netherlands. The company offers clients value-added consultancy and top-quality designs for water, infrastructure, environmental and construction projects. We deliver reliable solutions based on knowledge, experience and social insight. In an inspiring working environment, we take on fascinating challenges, while ensuring our core values of expertise, reliability and commitment. Besides the offices in the Netherlands, Witteveen+Bos is also located in Indonesia, Kazakhstan, Latvia, Russia, Belgium, and Vietnam. Furthermore, the company is a member of the Strategic European Expertise Network (SEEN) and takes part in several strategic alliances. Project information Owner The city of Amsterdam Architect Benthem Crouwel Architects, Amsterdam General Contractor The city of Amsterdam Engineering Office Consulting firm Noord-/Zuidlijn Location Amsterdam, The Netherlands Construction Period 2003 to 2017

RkJQdWJsaXNoZXIy MTgyMDE=