Nemetschek Structural User Contest 2013

225 X Nemetschek Structural User Contest 2013 - Category 4: Special Projects Category 4: Special Projects 4 Short description │Scaffold above a Nuclear Power Plant of Marcoule The project presents a shelter scaffold above a nuclear power plant of Marcoule in France. During maintenance works on the power plant the underground tanks must be dug out and simultaneously the environment must be protected. The internal dimensions of this huge shelter, consisting of about 7,600 structural members, are 29 m x 13.5 m and its stability is ensured solely by its self weight, no external anchorage is allowed. Significant wind loads forced us to use ballast on the structure and to find suitable geometrical solutions for favourable distribution of stresses in the steel tubes. The design was performed according to the Eurocodes and specific scaffolding codes. COMI SERVICE Contact Rémi MARTIN Address Batiment A6 Europarc de Pichaury 13856 Aix les Milles, France Phone +33 488783800 Email [email protected] Website www.comi-service.com Fondées en 1979, les COnstructions Métalliques de l’Isere lancent un département échafaudage en 1984 pour les besoins de la centrale nucléaire de Bugey. Puis en 1993, le fabricant de matériel d’échafaudage LAYHER rachète COMI qui devient COMI SERVICE. En 2001 LAYHER cède COMI SERVICE au groupe POUJAUD qui devient ainsi leader français de l’échafaudage. En 2012 le groupe ALTRAD entre dans le capital pour créer le groupe POUJAUD-ALTRAD puis rachète la totalité du groupe en 2013. COMI SERVICE en quelques chiffres : • 320 salariés en CDI. • 50 M€ de CA en 2011. • 7 agences opérationnelles réparties sur tout le territoire. • Un parc de 10.000 tonnes de matériel. Project information Owner Onet Technologies Nuclear Decommissioning General Contractor EDF Engineering Office COMI SERVICE Location Bagnol sur Ceze, France Construction Start 01/2014

RkJQdWJsaXNoZXIy MTgyMDE=