Nemetschek Structural User Contest 2013

269 X Nemetschek Structural User Contest 2013 - Category 4: Special Projects Category 4: Special Projects 4 Short description │Revolving stage, New Music Theatre The construction work for the new Musiktheater Linz began in 2009 after decades of discussions, planning and re-planning, and was finished with the gala opening in April 2013. The main hall of the Musiktheater provides a seating capacity for 1,000 people. The central element of the stage machinery is a large revolving stage for transport purposes with a diameter of 32 m. Located within this revolving stage is a smaller revolving stage for scenic transformations with a diameter of 15 m as well as three lifting platforms which cover the total area of 15 m x 12 m. Depending on the requirements of the performed show, either of the two parts of the large revolving stage can be rotated into the playing area of the main stage. Furthermore, the lifting platforms can pick up stage wagons which are driven onto the main stage from one of the side stages. This leads to extremely high requirements regarding the precision of the revolving stage’s rotary movement. Waagner-Biro Austria Stage Systems AG Contact Florian Oberlehner Address Leonard-Bernstein-Strasse 10 1220 Wien, Austria Phone +43 1 28844-533 Email [email protected] Website www.waagner-biro.com Waagner-Biro Stage Systems is one of the leading stage machinery companies worldwide. The company offers the complete spectrum of stage equipment for full and medium sized theatres, as well as mobile building equipment for arenas, stadiums and multi-purpose halls. As a supplier of complete solutions, Waagner-Biro Stage Systems designs and implements complex stage facilities in opera houses, theatres, concert halls, event centres, multi-purpose and exhibition halls, congress centres, stadiums and arenas. Special stage equipment for cruise liners, computer-aided stage control systems, mobile building equipment (e.g. automated telescopic stands for the highest technical demands), telescopic soundproof walls, mobile air cushion seating systems, soundproof board systems as well as special lifting platforms and stage wagon systems round off the delivery spectrum of Waagner-Biro Stage Systems. Project information Owner Musiktheater Linz GmbH (M.T.G.) Architect Terry Pawson Architects, London Engineering Office Waagner-Biro Stage Systems Location Linz, Austria Construction Period 12/2009 to 04/2013

RkJQdWJsaXNoZXIy MTgyMDE=