Nemetschek Structural User Contest 2013

32 X1 Category 1: Buildings Administrative Centre Soccer Federation - Rio Grande do Sul, Brazil The building, designed for a regional soccer federation, has 4 floors, an auditorium, basement, podium and administrative rooms. The roofs was made with concrete slabs interconnected with steel domes The biggest challenge in designing the project was to set all levels in the right position and the connections between the precast parts. The project had little or almost no repetition, and each precast piece demanded a specific detailing. There were concrete foundation walls, beams for bleachers, prestressed hollow core slabs, post-tensioned beams, prestressed beams, an access ramp, two elevator towers, and a facade with prestressed hollow core walls in balance, interaction with steel frames and stairs “in loco”. All in all, a project extremely complex and difficult to implement in precast concrete. Besides these factors, the short deadline for the design, production and assembly of parts of the structure was a significant challenge. A lot of information was received early in the project: information about the slabs and stairs that would be executed “in loco”, the steel structures of roofs and front facade with glass skin, the machinery of elevators, etc. Unfortunately, the information was isolated, not worked into an interconnected system of information, which made us lose precious time joining and matching it. Our strategy was to work to reconcile the initial information, check the interference and discuss them with the client and project stakeholders (structural designer for the “in loco” services, company supplier of elevators, and architects). The project design was thorough, preventing errors in production and assembling of parts. It was possible to identify several interferences by using the 3D model Allplan Precast. The main advantage in using Allplan Precast was error prevention and identification of interference at the time of preparing the executive project. Several cases of incompatibility were identified using the three-dimensional tool. Several pieces were detailed quickly because we already had a library with similar pieces. The design and detailing of prestressed hollow core walls and prestressed hollow core slabs were optimised due to software facilities. Using Scia Engineer was vital for the calculation of post-tensioning beams. The beams had cables with a parabolic path in the longitudinal direction, besides the lateral movement along the length of the beam. This modelling was only possible with the use of this software. Software: Allplan Precast, Scia Engineer

RkJQdWJsaXNoZXIy MTgyMDE=