163 Category 4: Special Projects 4 Owner Jan De Nul Engineering Office Multi Construction Period 09/2014 - 03/2015 MULTI was contacted by Jan De Nul, one of the largest Belgium dredging companies, to provide support in the engineering and delivery of production drawings of project equipment for a cable laying system that would be installed on a multipurpose vessel in their fleet. MULTI’s scope included: several pieces of equipment that would be installed on the main deck, namely foundations for conveyors and cable tensioners, guiding quadrant for the cable, a tower construction that guides the cable from the carrousel installed on the main deck to the aft deck, chutes that guide the cable once it is overboard, etc. SCIA Engineer was used to model and engineer parts of the deck equipment that were designed for this project. The project was very time critical for the client, putting a lot of pressure on our team to perform the necessary structural calculations in a very short time period to enable the design work to go ahead. Cable Laying System - China SE Contact Dieter Hoeterickx Address Orlaylaan 10 9140 Temse, Belgium Website www.multi.engineering MULTI guides customers to success. That’s why we deliver tailor-made engineering services and why we employ and develop highly-skilled engineers. MULTI serves three market segments: industry, building & infrastructure and maritime & offshore. We have projects throughout the entire life cycle of assets, from feasibility study up to decommissioning. Our services range from temporary staffing to full project management for designing, building or operating your assets. We have developed competence centres in different disciplines; steel construction is one of them. MULTI
RkJQdWJsaXNoZXIy MTgyMDE=