SCIA User Contest 2015

74 Category 1: Buildings 1 New Vitória’s Airport - Vitória/ES, Brazil AP Contact José Carlos do Amaral Address Manuel da Nóbrega, 760 Paraíso, São Paulo, Brazil CEP:04001-002 Website www.zamarionemillen.com.br Zamarion e Millen Consultores is a civil engineering company specialized in structural design and consultancy. It has been operating for 34 years with strong ethics, competence and professionalism. It took part in several important works for Brazilian progress and development (airports, quays, shipyards, stadiums, subways, shopping malls and schools). It values the commitment with quality and excellence in service, teamwork, its employees and the continuous improvement of knowledge through participation in courses, seminars and technical standards committees. Owner INFRAERO - (Airport Infrastructure Company) Architect Bacco Arquitetos Associados General Contractor Camargo Corrêa, Mendes Junior, Estacon Engineering Office Zamarion e Millen Consultores Construction Period 12/2014 - 01/2018 The passenger terminal for Vitoria’s new airport in Espírito Santo, Brazil, is being built in two similar stages. It has an area of about 37,000 m², planned with three structural systems (steel, concrete in situ and precast structure). We were responsible for designing the foundations, for the precast concrete structure and for the connections between these structural systems. We drew up the first phase in CAD (2D) and the other in Allplan with Nemetschek consultancy. Using Allplan we detailed the foundation elements, generating a detailed drawing from the structure modelling. Moreover, we developed an optimized workflow for detailing precast elements, generating the structure using Smart Symbols 3D of our library of drawing elements. We input into Smart Symbols all the necessary information for management, planning, budget and execution of the project. We were pleased to surpass customer expectations (reduced cost and execution time) changing the basic design (concrete in situ) to precast structure despite the bold shape, large span (22 m), cantilever (7 m), low structural height (1.55 m) and high soil deformation along time. We were also pleased that after completing the two phases we concluded that despite the fact that Allplan deadline was not reduced, we had an optimized product, no errors, improved precision and also the integration of information (BIM). Zamarion e Millen Consultores S/S Ltda

RkJQdWJsaXNoZXIy MTgyMDE=