SCIA User Contest 2023

126 In the production factory, the owner requested the installation of a walkway on the first floor, providing visitors and employees with an excellent view of the entire ground floor and creating a safe passage throughout the plant. The gallery length is 115 m and is constructed using prefab concrete slabs and steel framing. These elements are suspended from the roof trusses and support the prefab concrete floors. To ensure the structural integrity of the walkway, SCIA Engineer was employed to analyze deformations and vibrations. Additional bracing was introduced to enhance stiffness and raise the natural frequency of the structure. The 3D design capabilities of SCIA Engineer facilitated optimization by strategically placing steel only where necessary. The powerful Own Frequency module of the software enabled the assessment of vibrations caused by people walking on the walkway, ensuring its stability and safety. ARCHITECT Architectenbureau Cor & Partners B.V. OWNER ConDoor Door Solutions GENERAL CONTRACTOR HBE Bouw CONSTRUCTION PERIOD 2022 - 2023 ENGINEERING COMPANY Snetselaar Constructieve Ingenieurs Michel Garssen Galileilaan 36, Ede, Netherlands www.snetselaar.nl FACTORY BUILDING Zeewolde, Netherlands INDUSTRIAL BUILDINGS & PLANTS 3

RkJQdWJsaXNoZXIy MTgyMDE=