146 A beach cover structure was built using standard sea containers loaded with concrete blocks as walls and base construction. The roof was clad with plastic ozone-resistant film on curved beams. Located on a beach, the construction faced high wind pressure on the open side. SCIA Engineer software was used to calculate wind speeds and determine stability. The software also aided in analyzing material tensions, deformations, and cost estimations. By using uniform profiles, the engineering process was streamlined, reducing costs while ensuring structural integrity and safety. ARCHITECT We Can Dance OWNER We Can Dance GENERAL CONTRACTOR Vermako Cover Solutions, Tielt, Belgium CONSTRUCTION PERIOD 04/2021 - 06/2021 ENGINEERING COMPANY Audax Engineering Wim Vanpeperstraete Bergstraat 8, Heuvelland, Belgium www.audaxengineering.be WE CAN DANCE STAGE FESTIVAL Zeebrugge, Belgium SPECIAL PROJECTS 4