SCIA User Contest 2023

58 The new sports center will include a large sports pool (15 m x 25 m), a recreational paddling pool, an instruction pool (15 m x 8 m) with a movable floor, indoor and outdoor petanque and curling ball courts, a gym, existing gyms, a spacious cafeteria, and meeting rooms. The building’s supporting structure was optimized for robustness and sustainability, with a combination of materials and construction methods. For the roof with the largest span (25 m pool), cement-bonded wood wool panels on lamellar beams were chosen. Other roofs consist of concrete slabs with vaults or poured concrete, depending on the span. Geotechnical calculations using Plaxis 2D and SCIA Engineer helped design the flood barrier and pool structures. The project faced challenges of integrating different structural elements and connecting with the existing building. SCIA Engineer proved essential in modelling and analyzing the complex structures, providing flexibility for design modifications. It facilitated step-bystep construction and collaboration with reinforcement calculations. Overall, SCIA Engineer played a crucial role in ensuring a successful and efficient design process for this complex project. ARCHITECT Ld architecten OWNER Sportoase nv GENERAL CONTRACTOR Algemene Bouw Maes CONSTRUCTION PERIOD 12/2022 - 12/2023 ENGINEERING COMPANY TRACTEBEL ENGINEERING S.A. Safiye Durmaz Ilgatlaan 23, Hasselt, Belgium https://tractebel-engie.be/ SPORTOASE Evergem, Belgium BUILDINGS 1 6000 m² 6000 m²

RkJQdWJsaXNoZXIy MTgyMDE=