            Footbridges of the “Smedenpoort”
          
        
        
          With total lengths of 62.5 m and 57.2 m, respectively, the footbridges at the Smedenpoort in Bruges
        
        
          provide a safe passage for pedestrians embracing the listed gateway. Weathering steel is used for the
        
        
          main structure; concrete tiles form a bridge deck that is 2 m wide. To minimise the dimensions of the
        
        
          structural elements and maximise the transparency of the structure, the railing and bridge deck become
        
        
          structural and the spans are reduced. The position and dimension of the railing bars is determined by
        
        
          a pattern. Each 5 m section of the bridge is supported by a small column. The footbridges embrace the
        
        
          gateway with their curved trajectory and, at night, with light-emitting diodes integrated into the handrail
        
        
          of the outer railing.
        
        
          
            Ney & Partners
          
        
        
          Contact
        
        
          Bart Bols
        
        
          Address
        
        
          Terhulpsesteenweg 181
        
        
          1170 Brussels, Belgium
        
        
          Phone
        
        
          +32 2 6432180
        
        
          Email
        
        
        
          Website
        
        
        
          Ney & Partners is a structural engineering consultancy, established in Brussels. Since its creation in
        
        
          1997, the office has worked with a pro-active view on the art of engineering through the integration of
        
        
          the different civil works disciplines.
        
        
          This integration and optimisation of structural elements aims to overcome the classic hierarchic
        
        
          assembly of constructive solutions. Innovative bridges, roof structures and works of art developed by
        
        
          our office most clearly express this vision.
        
        
          The construction project quality lies in the synthesis of specific design constraints. The structural
        
        
          aspect is of primary importance to this synthesis. From the very beginning of the design process, Ney
        
        
          & Partners conducts constant research for advanced engineering integration. In doing so, our position
        
        
          as an engineering consultancy goes beyond the standardised dimensioning of predefined technical
        
        
          solutions. Ney & Partners currently employs more than 45 civil engineers, architects and draughtsmen.
        
        
          Project information
        
        
          Owner
        
        
          City of Bruges
        
        
          Architect
        
        
          Ney & Partners
        
        
          General Contractor
        
        
          Depret nv
        
        
          Engineering Office
        
        
          Ney & Partners
        
        
          Location
        
        
          Brugge, Belgium
        
        
          Construction Period
        
        
          06/2011 to 07/2012