163
Category 4: Special Projects
4
Owner
Jan De Nul
Engineering Office
Multi
Construction Period 09/2014 - 03/2015
MULTI was contacted by Jan De Nul, one of the largest Belgium dredging
companies, to provide support in the engineering and delivery of
production drawings of project equipment for a cable laying system that
would be installed on a multipurpose vessel in their fleet.
MULTI’s scope included: several pieces of equipment that would be
installed on the main deck, namely foundations for conveyors and cable
tensioners, guiding quadrant for the cable, a tower construction that
guides the cable from the carrousel installed on the main deck to the aft
deck, chutes that guide the cable once it is overboard, etc.
SCIA Engineer was used to model and engineer parts of the deck
equipment that were designed for this project.
The project was very time critical for the client, putting a lot of pressure on
our team to perform the necessary structural calculations in a very short
time period to enable the design work to go ahead.
Cable Laying System - China
SE
Contact
Dieter Hoeterickx
Address Orlaylaan 10
9140 Temse, Belgium
Website
MULTI guides customers to success. That’s why we deliver
tailor-made
engineering services and why we employ and develop highly-skilled
engineers. MULTI serves three market segments:
industry, building &
infrastructure and maritime & offshore
.
We have projects throughout the entire life cycle of assets, from feasibility
study up to decommissioning. Our services range from
temporary
staffing
to
full project management
for designing, building or operating
your assets. We have developed competence centres in different
disciplines; steel construction is one of them.
MULTI