SCIA User Contest 2005

89 Pending bridge in the Maria Hendrika Park in Oostende The Maria Hendrika Park, better known as “Het bosje”, needed to be renovated. Technum nv submitted a project in which the main structure of the park was simplified and lightened up. Some of the more declined areas were foreseen with actual programs and this all with regard to the historic structure and the trees present. The project consisted of a plan for general redesign, a plan for the management of the domain, the execution of the various projects, which involves also the detailing and the materializing of certain elements that are part of the urban development plan. The project consisted of multiple subprojects, the execution has started in 2003. One particular subproject concerned the construction of a 72,5m long pending bridge, which was designed and calculated in ESA-Prima Win. Seen the large span of the pedestrian bridge, an extensive study on the Eigen (natural) modes and frequencies, as well as the dynamic response calculation was necessary. For both these studies ESA-Prima Win was used. Short Description

RkJQdWJsaXNoZXIy MTgyMDE=