Nemetschek Structural User Contest 2013 - Category 4: Special Projects
Category 4: Special Projects
4
Short description │
Burial Sledge System II
When offshore windfarms are built, offshore cables have to be installed to transfer the energy to
the shore. These cable routes frequently cross shipping lanes and for reasons of protection these
submarine cables often have to be buried. Due to seabed migration, cable owners installing new
cables more often demand an increase of the burial depth in order to reduce the risk of exposure
to, and eventual damage and failure of, the submarine cable. Larger burial depths are potentially
problematic since there are few tools available to realise such burial depths. The Burial Sledge System
II (BSS-II) is a system that can realise burial depths of up to 6 m under the seabed.
Visser & Smit Hanab bv
Contact
Bertus Span
Address
Rietgorsweg 6
3356 LJ Papendrecht, The Netherlands
Phone
+31 78 6417222
Email
Website
Visser & Smit Hanab is a contractor which develops, builds and maintains connections, networks and
installations for water and energy. Safety is a top priority. Our goal is to expand our position in the
total building process, and to be the best in our professional field. Thanks to our staff, our advanced
techniques and our customer-oriented approach, we are able to provide our customers with the
optimum support to meet their needs. Together with our customers, we are making a contribution to
a sustainable society. In everything we do, we are customer-oriented, progressive, honourable and
professional.
Project information
Owner
VSMC
Architect
Visser & Smit Hanab
General Contractor
VSMC
Engineering Office
Visser & Smit Hanab
Location
Rotterdam, The Netherlands
Construction Period
03/2012 to 03/2013