79
X
Nemetschek Structural User Contest 2013 - Category 1: Buildings
Category 1: Buildings
1
Short description │
Residential Building “Na Santince”
The residential building “Na Santince” is a proposed new development of P.H.A., a.s. The building
consists of 6 storeys above grade and 3 storeys below grade.
The above grade part of the building includes 25 residential flats and two commercial suites. The
access is through an arbour, which emphasises (or delineates, defines) the building’s street facade.
The two top storeys are unique due to the indented facade that enables the construction of spacious
terraces with a unique view of the historic part of Prague and the residential area Hanspaulka. The
parking and technical services are situated in the underground.
P-H-A
Contact
Hana Gattermayerova
Address
Gabcikova 15
Praha 8
18200 Praha, Czech Republic
Phone
+420 284685882
Email
Website
Atelier P.H.A. was founded in 1990.
P.H.A. deals with design tasks, preparation and implementation of investment projects and engineering
activities, and is an expert in the field of construction and real estate investments. P.H.A. participates
in opinions carried out on structures after the 2002 flood, opinions on the condition and measures
taken on load-bearing structures in industrial, high-rise apartment buildings and apartment building
regeneration, opinions on the impact of emergency situations - like fires and flooding - on load-bearing
structures, and in building passports during reconstruction etc.
PHA can follow up on international projects in accordance with most standard codes: Eurocode, Fema-
350, UBC97, СНИП and other specific national codes. Structure designers participate in professional
seminars, as well as structural engineering meetings and conferences, and lectures, and their
contributions are published in professional newspapers.
Project information
Owner
Atelier P.H.A. Ltd.
Architect
Ing. arch. Ondřej Gattermayer
General Contractor
P.H.A. Inc.
Engineering Office
Atelier P.H.A. Ltd.
Location
Prague, Czech Republic
Construction Period
05/2012 to 02/2013