Category 3: Industrial Buildings and Plants
3
HV Electrical Revamp Zeeland Refinery - Vlissingen-Oost, The Netherlands
AP
Owner
Zeeland Refinery
General Contractor
Aannemingsbedrijf Fraanje B.V.
Engineering Office
Grontmij Nederland BV
Construction Period 05/2012 - 06/2013
A new transformer station (72 x 28 m) including different medium and high
voltage installations and sufficient capacity has been built for Zeeland
Refinery.
The building consists of:
• Cable cellar (ground level).
• Transformer position and fuel storage, including the necessary
foundations.
• Switchroom above the cable cellar.
The structural model was created using Allplan Engineering and
included in-situ concrete foundations, cellar floor and concrete walls.
The superstructure consisted of a prefabricated concrete column/beam
structure with wide slab floors and a hollow core slab roof.
All constructive layout drawings of the building were made in Allplan.
Furthermore all in-situ floors, walls and foundations were generated
into 2D line drawings. After that all in-situ components were reinforced
in the 3D model and generated into 2D drawings, which were released
for production. The biggest advantage of reinforcing the concrete in the
3D model was immediate insight into difficult cable entry points.
Grontmij Nederland BV
Contact
Edwin Fraanje
Address Segeersingel 6
4337LG Middelburg, The Netherlands
Website
Grontmij provides consultancy, design & engineering and management
services in a broad range of market sectors related to the built and natural
environment.
Within our range of expertise, and with approximately 7,000 professionals
around the world, we aim for European leadership in five Group growth
activities: Energy, Highways & Roads, Light Rail, Sustainable Buildings
and Water.
Our guiding principle is sustainability by design which is a leading value
proposition for our customers.
1...,116,117,118,119,120,121,122,123,124,125 127,128,129,130,131,132,133,134,135,136,...178