Title - City, Country
127
SE
AP
Category 3: Industrial Buildings and Plants
3
Contact
Jürgen Mark
Address Gräfin-Euphemia-Str. 5a
89264 Weißenhorn, Germany
Website
Since 2003 we have been capturing and designing various constructions
from the areas of steel construction, steel lightweight construction,
facades, aluminium and glass construction in 3D-CAD.
Through innovative and problem solving oriented project handling,
effective use of the newest technologies and participation in constant
advanced training, our company has developed a competitive advantage
and is able to provide the client with economic benefits.
Owner
PERI Artur Schwörer GmbH & Co. KG
Architect
Ingenieurbüro Degen und Partner
General Contractor
H. Brandner Stahlbau e.K.
Engineering Office
Ingenieurbüro Degen & Partner und Ingenieurbüro
für Stahlbau Dipl. Ing. (FH) SFI Jürgen Mark
Construction Period 2012 - 2013
An approximately 1,600 m
2
L-shaped roof was built between two
pre-existing industrial buildings in the loading area of a concrete
manufacturing plant.
With main dimensions of approx. 51 x 46 m, a span of up to 30 m needed
to be bridged. The dimensions and connection points of the steel structure
had to meet the requirements of a hot-dip galvanised steel design.
Moreover, construction was impacted by limitations such as utilising the
pre-existing buildings as support, as well as the demand for a large roofed
area accessible to trucks, without structural supports being in the way.
The already existing building and the new construction were visualized
in 3D-CAD and were afterwards imported via the import function into
SCIA Engineer.
Company
Roof Between 2 Industrial Buildings - Weißenhorn, German
Ingenieurbüro für Stahlbau Dipl.-Ing. (FH) Jürgen Mark