233
X
Nemetschek Structural User Contest 2013 - Category 4: Special Projects
Category 4: Special Projects
4
GSG Georgsmarienhütte Service Gesellschaft mbH
Short description │
Repair and Revise of Dust Collection Line
The main reason for the static calculation for the dust removal duct was the modernisation of the
shutting and depressurising flap and the renewal of the concept of supports. The three suction lines
(electric arc furnace, roof converter and cold line) fused to a cross and the 4,000 mm duct. Every
line can be closed by a shutting flap. Several compensators absorb the temperature lengthening and
movements of the duct. All outside parts of the duct will be renewed in summer 2014.
Contact
Reinhard Mesker
Address
Neue Hüttenstr. 1
49124 Georgsmarienhütte, Germany
Phone
+49 5401/394808
Email
Website
,
Die Georgsmarienhütte GmbH zählt zu den führenden europäischen Anbietern für Stabstahl, Halbzeug,
Rohstahl und Blankstahl aus Qualitätsstahl und Edelbaustahl. Bei der Stahlerzeugung im Gleichstrom-
Elektrolichtbogenofen kommt ausschließlich aufbereiteter, sortierter Stahlschrott zum Einsatz.
Stahl aus der Georgsmarienhütte wird überall dort eingesetzt, wo die Belastung am größten ist, wo
Kraft erzeugt oder übertragen wird und wo Sicherheit eine Rolle spielt. Unser Stahl hält ein Auto in
Bewegung: Unsere Kunden fertigen Kurbelwellen, Pleuel, Nockenwellen, Antriebswellen, Getriebeteile,
Fahrwerksteile und vieles mehr. Neben der Automobilindustrie und deren Zulieferern liefern wir Stahl
für Ketten, Maschinenbauteile und Hydraulikkomponenten sowie Rohblöcke für Freiformschmieden.
Umfangreiche Informationen können der Internet-Seite der Georgsmarienhütte GmbH (
)
entnommen werden.
Project information
Owner
Georgsmarienhütte GmbH
Architect
Georgsmarienhütte GmbH
General Contractor
Georgsmarienhütte GmbH
Engineering Office
GSG - Georgsmarienhütte Service GmbH
Location
Georgmarienhütte, Germany