Scia User Contest 2002 - page 34

Why is this project important?
The Remax is a
major product of SBM in sector
mobile
plants, about 15 units a sold till now. They do they work in
whole Europe, so after sales problems are expensive and
have to be avoided during the design studies.
Why is this project so special?
The calculated mainframe has to carry and to move the
whole equipment. Extreme load cases are moving on hills,
turning and operation of the plant.
Most of the machines
are vibrating, so dynamic effects must be considered.
Use of ESA-Prima Win
Technical questions to be solved with ESA-Prima
Win
The mainframe has to be strong but light, especially for
load case turning the lateral forces very high. For
calculation of the crawlerframe consisting of box profiles
most of the construction has to be designed to get the
right forces of the machines. Even the crusher is used as
box to get the stability.
Experience with ESA-Prima Win when realising the
project:
A high number of SBM-machines consist of plats and
profiles and are situated on steel construction, so they
could be calculated with EPW.
33
SCIA User Contest Catalog
1...,24,25,26,27,28,29,30,31,32,33 35,36,37,38,39,40,41,42,43,44,...91
Powered by FlippingBook