Power Plant Castelnou
Ingenieursbureau
STENDESS N.V.
Grote Baan 18
9920 Lovendegem
Belgium
Tel.: +32 9 370 71 25
Fax: +32 9 372 43 95
Contact: ir.
Geert Goethals;
ir. Jurn De Vleeschauwer
Email:
Website:
A steel and concrete engineering
company
Stendess can vouch for the total stability
analysis of projects.
Our approach covers
the initial study trough to the end project.
With its in-house know-how in steel as well
as concrete, the firm is able to offer full study
pack-ages for both materials.
Thanks to its accumulated know-how and
its advanced infrastructure, Stendess can fol-
low up on cross-border projects in accor-
dance
with
most standards and codes:
Eurocode,
NBN,
NEN,
DIN,
NF,
AISC, British
Stan-dards and specific national codes.
Key activities
Industrial
buildings
: steel factories,
power plants, depots, etc
Other buildings
: service buildings, con-
cert
halls, sport facilities, swimming
pools, apartment buildings
Bridge construction
: all types of bridges
Off-shore projects
: lock gates, Roro, oil
rigs,
Industrial
equipment
: silos, cranes,
crane ways
Erection engineering
: longitudinal and
transverse repositioning, skidding, hoist-
ing,…
Type
:
Gas fired combined cycle power plant
(800 MW)
Location
:
Castelnou, Spain
Owner
:
Castelnou energia S.L.
Engineering
office
: Ingenieursbureau
STENDESS N.V., Lovendegem, Belgium
Contractor
:
CMI-group, Seraing, Belgium
Total steel
weight
: ± 600 tonnes
Dimensions
: 18,5 m x 36,5 m x 65 m
Building period
:
middle 2004 -
middle 2005
Short description of the project
It concerns the realization of 4 identical gas
fired combined cycle power plants in Castel-
nou, Spain.
The steel structure had to be designed to
support a total equipment weight of ± 2000
tonnes and a total piping
weight of 1250
tonnes.
About 80% of this weight is situated
at a height of ± 30 m. The
whole project
was situated in a seismic dangerous zone
and a high wind speed zone.
Use of ESA-Prima Win
Description of technical questions
solved by ESA-Prima Win
The challenge in this project was to design
a low budget supporting steel structure for
a gas fired combined cycle power plant
which was situated in a seismic dangerous
and high
wind speed zone and of
which
the to be supported weight (± 2250 tonnes)
was situated at a high level above the
ground (± 30 m),
which is very defavorable
in a seismic zone.
The simulation of the seismic actions
was
done by static equivalent horizontal loads in
accordance to the natural frequency of the
structure.
Finding the balance between a relatively
low stiffness of the whole structure (in order
to decrease the seismic impact) and a suffi-
cient supporting structure with expectable
deformations was a high creative demand
in the static layout and the dimensioning of
the structure.
Description of our experience with ESA-
Prima Win when realizing the project
For this project ESA-Prima Win proved its
power to calculate at high speed large
structures with a great number of bars and
a great number of combinations.
More, ESA-Prima Win proved that even for
large structures the dynamic calculations
could be done in an acceptable
way and
time.
Even optimisation of such large structure
didn’t give much problems.
Used modules
• Base
• 3D-frame
• Dynamics frame
• Steel code check (EC3)
Power Plant Castelnou
SCIA User Contest 2005 / Steel constructions
4